Whispering Pines Drainage Improvements Map(PDF, 1MB)
Meeting Letter for Residents(PDF, 195KB)
Areas of Concern Map(PDF, 145KB)
Project Area Alternatives(PDF, 3MB)
Whispering Pines Capital Improvements Drainage Project is a large-scale project generally bounded by Masonboro Loop Road to the west, Orchard Trace to the north, Masonboro Sound Road to the east, and Shorewood Hills Drive to the south. The area consists of multiple drainage areas (sub-watersheds) that drain up to four distinct neighborhoods. These multiple sub-watersheds and outfalls all flow directly into the Intracoastal Waterway to the east.
The project will improve existing drainage infrastructure such as culverts, curb inlets and open channels. The project study will include land survey, modeling and developing engineered design alternatives to reduce flooding of these local streets and private property throughout this area. The existing drainage infrastructure has aged for many years and requires up-grading. Additional infrastructure may also be required.
Preliminary Engineering is completed. A Meeting Letter for Residents(PDF, 195KB) has been mailed out to residents for a drop-in community meeting on October 11th at Fire Station #15 (3335 Masonboro Loop Rd, Wilmington, NC 28409) to hear from interested residents about their specific drainage issues and to provide comments concerning the proposed drainage improvement alternatives.
This project requires easement acquisitions to establish permanent drainage easements along the drainageways for construction and for long-term maintenance by the city. These easement locations will be available for viewing and discussion at the community meeting.